Cast In-Situ Piling Operations Training Course
Conduct Cast In-Situ Piling Operations
RIICFW305D
This course is designed for students to gain the skills and qualifications to operate an excavator for the Civil Construction, Mining, Building, Facilities and Asset Management industries. We offer competitive pricing on all our courses and are happy to negotiate where more than one course or more than one student will be completing the course.
Recognition of Prior Learning (RPL) can be offered providing suitable evidence is supplied. Discuss this with our support staff prior to beginning the course. Upon completion of the course you will be provided with a Photo identification card detailing your qualifications and a certificate demonstrating a Statement of Attainment (SOA)
Key Points
Plan and prepare to conduct in-situ pilings operation
Locate and prepare pile positions
Place concrete
Remove boring rig
Conduct clean-up activities
Foundation Skills required
This section describes those pre-requisite language, literacy, numeracy and employment skills that are essential to performance.
Reading
Identifies and interprets information from workplace procedures, documentation, legislation and regulations
Numeracy
Uses equipment operating capacity schedule to confirm safe weight load limits
Course Outline
1. Plan and prepare to conduct in-situ pilings operations
1.1 Access, interpret and apply documentation to boring of cast in-situ piles and ensure the work activity is compliant
1.2 Obtain, interpret, clarify and confirm work instructions before proceeding
1.3 Confirm and apply environmental protection and safety requirements
1.4 Obtain, interpret and implement traffic management signage
1.5 Select plant, tools and equipment and check for faults to carry out tasks
1.6 Select and wear correct personal protective equipment appropriate for work activities
1.7 Identify, address and report environmental issues, potential hazards and risks
1.8 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Locate and prepare pile positions
2.1 Establish location for piles from reference points and set out
2.2 Position and check plant and related equipment for operation
2.3 Bore hole
2.4 Check caisson for conformity with specification
2.5 Install caisson in the bored hole
2.6 Prepare caisson to receive concrete
3. Place concrete
3.1 Place concrete into caisson
3.2 Vibrate concrete, removing voids and air pockets
4. Remove boring rig
4.1 Relocate boring rig to next point of installation operation
4.2 Remove boring rig from site on completion of work
5. Clean up
5.1 Clear work area and dispose of or recycle materials
5.2 Clean, check, maintain and store plant, tools and equipment
exerpt from https://training.gov.au/Training/Details/RIICFW307D