Shift Loads using Bridge or Gantry Crane Training Course
Shift Loads using Bridge or Gantry Crane
TLID0008
This unit involves the skills and knowledge required to shift loads using bridge or gantry crane in accordance with relevant regulations and workplace requirements as part of work activities in the transport and logistics industry.
It includes planning work for the prevailing working conditions, using controls and operating systems to manage the operation of equipment, and locating and identifying load characteristics. It also includes safely moving the load; monitoring controls and stopping, shutting down and securing equipment after the completion of operations.
We offer competitive pricing on all our courses and are happy to negotiate where more than one course or more than one student will be completing the course. Recognition of Prior Learning (RPL) is not available for this course. Discuss this with our support staff prior to beginning the course. Upon completion of the course you will be provided with a Photo identification card detailing your qualifications and a certificate demonstrating a Statement of Attainment (SOA).
Foundation Skills required
This section describes those pre-requisite language, literacy, numeracy and employment skills that are essential to performance.
Reading
Identifies and interprets information from workplace procedures, documentation, legislation and regulations
Numeracy
Uses equipment operating capacity schedule to confirm safe weight load limits
Course Outline
1. Prepare work for the prevailing working conditions
1.1 Traffic flow, weather and work area conditions are constantly assessed and adjusted to allow for safe operations
1.2 Hazards are identified, risks are assessed and control measures are implemented
1.3 Load characteristics are taken into account to ensure appropriate attachments/gear are used to move the load in accordance with lift plan
1.4 Occurrences in the work area that may affect the safety and efficiency of operations are reported to relevant personnel in accordance with workplace procedures
1.5 Bridge or gantry crane and equipment are inspected and configured in accordance with manufacturer specifications, prepared and appropriate attachments fitted
1.6 Crane pre-operational checks are conducted in accordance with manufacturer specifications and workplace procedures
2. Operate bridge or gantry crane
2.1 Bridge or gantry crane is started and operated in accordance with manufacturer specifications
2.2 Instruments and gauges are monitored to ensure operation is within manufacturer specifications and workplace procedures
2.3 Faults or damage to bridge or gantry equipment are immediately reported to relevant personnel in accordance with workplace procedures
3. Locate load and identify load characteristics
3.1 Load is located and identified
3.2 Working load limit (WLL) of bridge or gantry crane and equipment are identified and communicated to relevant personnel
3.3 Load characteristics, weight and dimensions are checked to ensure gantry lifting capacity is not exceeded
3.4 Loading and unloading plans are followed to ensure efficiency and safety of operations
3.5 Load and environmental conditions are assessed to ensure appropriate loading and unloading procedures are followed
3.6 Hazardous cargo is identified and relevant procedures are taken into account when planning and conducting work
4. Operate bridge or gantry crane to safely move load
4.1 Bridge or gantry crane is operated and positioned using smooth and controlled movements
4.2 Movements are within equipment limits and in line with manufacturer specifications
4.3 Load is moved in accordance with workplace procedures and to ensure safe operation
4.4 Communication is maintained with relevant personnel
4.5 Bridge or gantry crane is immediately stopped, and workplace procedures are followed, in the event of an incident or emergency
4.6 Bridge or gantry crane controls are operated and monitored in accordance with manufacturer specifications
4.7 Bridge or gantry crane control faults are identified and reported in accordance with workplace procedures
5. Shut down and secure crane
5.1 Bridge or gantry crane is shut down in accordance with manufacturer specifications and workplace procedures
5.2 Equipment is secured in accordance with workplace procedures
More information on the legislative training requirements can be found here – Foundation Skills Companion
exerpt from – https://training.gov.au/Training/Details/TLID0008/unitdetails